Requirement Life cycle Management (Pg 42)
All about requirements/design
- 5.1 input Trace Requirement
Output Traced Requirement, Link to 7.5 Define Design Output.
- 5.2 Input Maintain Requirement
Output Maintained Requirements/ Design
- 5.3 Prioritize Requirements
Output Prioritised Requirements/ Design, Link to 6.3 Assess Risks
- 5.4 Assess Requirements Change, Might also involve proposed change
Output Assessment of Requirements and Design Change
- 5.5 Approve Requirement
Output Approved Requirements/ Designs